Screen from balcony re-hung At Jourdan Crossing Building and hooked back up. |
 |
HVAC Drain Lines Anchored |
 |
Electrical: Install Power Distro Pigtail |
 |
Electrical: Install Producer downlights |
 |
Trim: Media room window rattling, needs reset |
 |
Electrical: hook up under stage distro panel |
 |
Eletrcial: Replace Balast in media closet fixture |
 |
Electrical: New circuits on sides of balcony for new light bars |
 |
WorkDay: Lightbulb Replacement |
 |
WorkDay: Stained ceiling tiles painted or replaced (LTR, Halls, Bathrooms) |
 |
WorkDay: Old Projectors Down |
 |
WorkDay: Fix / Replace Outlet Safely Covers in Nursery Area |
 |
WorkDay: Nursery reception area - wall really needs to be painted |
 |
WorkDay: Paint Patch outside Pastor's Counceling Room |
 |
WorkDay: Fix Signs by road - Large Sign: Wood coming apart - Caulk and Paint, Small Signs need better anchors / mount a piece of wood to anchor to? |
 |
WorkDay: Paint entry to upstairs men's bathroom |
 |
light out in upstairs mend ropm |
 |
Install screen in east training room |
 |
Install Camera and Monitors in Office (from JCB) so Susan / Brenda / Judy can see waiting area and Door |
 |
Electrical: replace light fixture over baptismal (or balast?) |
 |
LOCK: KEYS for library staff (4?) |
 |
Install New Lightbars on sides of balcony |
 |
WorkDay: Door Stop Fixed, kitchen doorstop needs to be replaced, others around building |
 |
WorkDay: HVAC vents Dusted / Vacumed around entire building |
 |
WorkDay: Carpets Spot Cleaned - in front of men's room in front foyer; choir room, Halls, Sanctuary |
 |
WorkDay: back of Balcony Chairs re-set |
 |
WorkDay: signs around property, especially the one in front of the driveway (toward Dessau) |